Row edge-slant Shape Decorative svg added to bottom

Announcements

Summer 2026 Campus Renovations

Throughout the summer, several areas of campus will undergo renovations, construction and routine maintenance according to our FY27 capital plan and list of donor-funded projects.

Alumnae Hall

  • Create new hallway and dividing door in women’s locker room for laundry services
  • Install new washers and dryers for athletic needs
  • Install new emergency generator for the building

Campuswide

  • Patch concrete
  • Trim and remove trees
  • Remove and replace carpet in dorm areas and other spaces around campus
  • Relocate various offices

Dechantal

  • Turn over dorm rooms (clean rooms, repair furniture, snake all shower and sink drains)

Gabriele Library

  • Refresh Terrace level, including adding a broadcast studio, podcast studio and digital media lab for academic purposes
  • Refresh the front of the building, including new concrete and removal of bushes
  • Install new emergency generator for the building

Gillet Hall

  • Convert old kitchen and dining room into new dorm rooms (18 students)
  • Convert old chapel into a laundry room, multi-purpose room and kitchenette

Good Counsel 

  • Relocate media photography room from Gabriel Library to Room 22

Grotto

  • Create new Grotto behind the Lettiere center

Lettiere Center

  • Install new AC units throughout the building (inside and outside)
  • Install new camera facing the Grotto

Lourdes

  • Paint all doors and door frames on the 3rd and 4th floor dorms
  • Convert 2 lounges to dorm rooms (4 students total)
  • Install new door at Campus Ministry entrance
  • Turn over dorm rooms (clean rooms, repair furniture, snake all shower and sink drains)

Loyola Hall

  • Add door to separate meeting room and classroom 312

Marian 

  • Convert apartment 27 into dorm room (3 students)
  • Turn over dorm rooms (clean rooms, repair furniture, snake all shower and sink drains)

Villa Maria Hall

  • Convert 2nd Floor Villa West offices into dorm rooms (14 students)
  • Convert 2nd Floor Villa East lounge into dorm room (4 students)
  • Install new Terrace Rotunda furniture
  • Install new furniture and window coverings in the Villa 1st Floor alcoves, 2nd west alcove
  • Install new window coverings in the Green Room
  • Replace Exterior Dome Windows (9 windows)
  • Turn over dorm rooms (clean rooms, repair furniture, snake all shower and sink drains)

Waste Treatment Plant

  • Replace pumps, motors, and blowers

West Campus Apartments

  • Install new AC unit for (2) apartment units
  • Insall new apartment common area furniture in both buildings (12 units)
  • Turn over dorm rooms (clean rooms, repair furniture, snake all shower and sink drains)

Posted: May 21, 2026
Expires: June 17, 2026